o
Finish soffit on bunk house
o
Build new stairs inside Retreat Center
o Install tile in Retreat Center-2000'
o Install tile in Dottie Shaw-4500'
o Install tile in Dining Hall-2500'
o Build new wood fence along entrance drive.
o Build new equipment storage for Dottie Shaw
o
Pressure wash decks
o
Clear area for outpost camp
o
Move Tank and dismantle pump at Retreat Center
o Landscape entrance driveway
o
Stabilize new driveway entrance****
o
Move
main camp sign*
o
Build new floating boat dock***
o
Pull
weeds at beach
o
Stump removal/grinder*
o
Rake
leaves gather brush
o
Transplant trees ($50/Tree)
o
Replace pool table felt
o
Repair pool cues
o
Repair foosball tables
o
Move
supplies from garage to barn
o
Dismantle garage
o
Build shed roofs on outside of barn
o
Rebuild brick sidewalk at office
o
Clear brush at Retreat Center
o
Paint Dottie Shaw worship center
o
Clear new lake-side vespers area
o
Setup new ping pong table
o
Install new cabinets & countertop in Retreat Center*****
o
Build new porch on Dottie Shaw
($15,000)
o
Paint shelters
o
Begin remodeling Dean’s Office
o
Make
Curtains for the cottage*
o
Build Porch on Lake Front ‘Shack’***
o
Enclose Porch on Office**
o
Hang & Tape Drywall in new conference Room
*Funding Needed
* $250
** $500
*** $1000
**** $1500
***** $2000